Trenchless installation of three high-density polyethylene (HDPE) casings during construction of an OBI retail centre. The total installed length was 120 m.

OBI retail centre — project photograph
Photograph from the GlavBurProekt project portfolio.
Location
Psarki, Noginsk district
Client
Park Podvyaznovo LLC
Scope
Three HDPE casings
Pipe / casing diameter
250 mm
Total installed length
120 m
Recorded duration
3 days

Planning similar work?

Send the utility layout, number and dimensions of casings, crossing lengths and site access conditions. If a design is not yet available, we will define the investigations and design work required.

Engineering and delivery for your project

Our own team carries out the agreed site investigations, design, technical quality control and as-built documentation. We engage and coordinate specialist drilling crews with equipment suited to the task.

The scope for a new project is agreed in the proposal. Quantities and durations in this case describe completed work; a new programme and price depend on your site information.