Trenchless installation of a 400 mm HDPE pipeline using horizontal directional drilling. The total installed length was 182 m.

- Location
- Alekseevka, Istra district
- Client
- Mansurovskoye Quarry Administration
- Scope
- HDPE pipeline installed by HDD
- Pipe / casing diameter
- 400 mm
- Total installed length
- 182 m
- Recorded duration
- 4 days
Planning similar work?
Send the route plan and profile, pipe specification and available ground investigation information. Pipe string preparation space and equipment access will be reviewed for the site.
Engineering and delivery for your project
Our own team carries out the agreed site investigations, design, technical quality control and as-built documentation. We engage and coordinate specialist drilling crews with equipment suited to the task.
The scope for a new project is agreed in the proposal. Quantities and durations in this case describe completed work; a new programme and price depend on your site information.