HDD, site water supply and investigation drilling in Moscow and Moscow Region. Equipment, crews and the scope are selected for each task.
Horizontal directional drilling
Installation of underground pipelines using HDD. We connect engineering preparation, specialist drilling works and documentation under one project manager.
Site water supply
Water-source assessment, drilling coordination, well equipment, water treatment and commissioning under one project manager.
Explore water supplyInvestigation drilling
Drilling to your programme, compact rigs, basements and restricted access. Auger, vibratory, cable-tool and core drilling.
Explore investigation drillingRoad crossings
Trenchless crossings beneath roads and access routes. We review the route, existing utilities, site access and the requirements of the road owner.
Protective casings
HDPE or steel casings for underground utilities, as specified by the design. We agree the number, diameter and length of casings and the associated works.
Cable ducts and casings
Trenchless installation of protective ducts and casings for power and communications cables. Cable supply, pulling and connections are defined separately in the scope.
Pressure sewer pipelines
HDD installation of pressure sewer sections. Connections, testing, pits and reinstatement are agreed separately. Gravity sewer routes require a separate assessment of the design profile and installation method.
Engineering and documentation
In-house site investigations, design, technical quality control and as-built documentation within the agreed scope.
Explore our engineering scopeA quotation with a defined scope
To start, send the location, crossing lengths, pipe diameter and material, any available design and your target dates. We will identify the missing information before confirming the final solution and price.
- Engineering preparation: investigations and design within the agreed scope.
- Construction: drilling quantities, materials and associated works shown separately.
- Site arrangements: pipe supply, mobilisation, pits, water, drilling fluid handling, reinstatement and approvals allocated between the parties.
- Commercial terms: assumptions, exclusions, taxes, milestones and the procedure for agreeing changes.
Price and duration depend on ground conditions, crossing geometry, pipe specifications, access and the permitted working schedule.
From the brief to handover
- Review the task and available information.
- Agree the engineering solution, estimate and programme.
- Confirm site readiness and mobilise the drilling crew.
- Manage construction and agree changes before additional work.
- Hand over the completed work and agreed documentation.